Split System Installation
Supply and install of new System 1 to System 4 wall units — sized to the room, piped concealed, commissioned and warrantied.
The copper between the indoor unit and the condenser is the part nobody thinks about until it is done badly — exposed runs taped across a wall, drainage that backs up, or trunking that clashes with the carpentry. Good pipe-work is invisible and trouble-free, and putting that right is the whole job here.
We extend runs for relocated units, re-route trunking cleanly around new built-ins, and replace ugly exposed pipes with concealed copper inside neat, colour-matched trunking. Where a renovation has moved walls or a unit needs to shift, we plan the new run so it disappears rather than draws the eye.
It is priced from a small standard run and scales with the metres and the difficulty of the route. If you are renovating, it is worth doing the pipe-work before the painters and the carpenters finish — we will gladly co-ordinate with your contractor so everything lines up.
Renovated layouts, longer-than-standard runs, or messy existing trunking that needs tidying.
Supply and install of new System 1 to System 4 wall units — sized to the room, piped concealed, commissioned and warrantied.
A fixed-scope supply-and-install package built for new BTO flats — concealed trunking, key collection scheduling and a clean first fit.
Supply and install for condos and apartments — MCST-compliant condenser mounting, ledge brackets and managed-estate access handled.